Category: Digital Infrastructure

  • AWS demonstrates Qwen3 training on Trainium hardware using torchtitan

    AWS demonstrates Qwen3 training on Trainium hardware using torchtitan

    Amazon Web Services (AWS) has published a technical guide detailing how to train Qwen3 models on its Trainium hardware using torchtitan, a library designed for large-scale model training. The documentation illustrates how developers can leverage TorchNeuron to integrate Trainium accelerators with standard PyTorch interfaces, enabling both pre-training and fine-tuning workloads.

    Training Configurations

    The guide outlines three distinct methods for training Qwen3 on a trn2.48xlarge instance, which features 16 Trainium2 accelerators and 128 physical NeuronCores:

    • Transformers v5 Integration: This approach uses the Transformers library as the modeling backend. It enables the direct use of Hugging Face Hub models through AutoModelForCausalLM, allowing for the direct reading and writing of safetensors.
    • Native torchtitan Models: By adjusting the model configuration, users can utilize the native Qwen3 implementation provided within torchtitan, offering an alternative to standard Hugging Face workflows.
    • Mixture-of-Experts (MoE) with NKI Kernels: This configuration incorporates Neuron Kernel Interface (NKI) recipes to handle mixture-of-experts layers. Developers can use the torchtitan override registry to attach custom NKI operators, providing flexibility for specialized workload optimization.

    Technical Implementation

    For these configurations, AWS utilizes torchrun to manage 64 training processes across the logical NeuronCores. The implementation supports both eager mode and torch.compile, with TorchNeuron handling the registration of Trainium as a native PyTorch device. The guide also details how to create and register custom NKI kernels, such as a specialized rotary embedding kernel, to optimize performance for specific tensor shapes and sequence lengths.

    AWS notes that these configurations maintain consistent launch patterns and structural requirements, allowing users to move between different training approaches without altering their underlying infrastructure setup. The documentation emphasizes that the override registry allows for granular control over model components, enabling developers to replace standard PyTorch operations with high-performance NKI-based kernels while maintaining autograd compatibility.

    As of the publication, these methods rely on specific versions of torch, transformers, and the torchtitan-neuron package to ensure compatibility with the Neuron driver, runtime, and compiler environments.

    Source: aws.amazon.com
    Original article: https://aws.amazon.com/blogs/machine-learning/train-qwen3-on-aws-trainium-with-torchtitan/

  • TeraWulf addresses architecture challenges for AI and high-performance computing

    TeraWulf addresses architecture challenges for AI and high-performance computing

    Securing sufficient power remains the foundational challenge for organizations developing campuses for artificial intelligence and high-performance computing (HPC). As demand for compute-intensive infrastructure grows, the transition from initial power acquisition to full-scale AI readiness requires complex architectural planning.

    For companies like TeraWulf, managing these requirements involves integrating robust power management strategies with the physical and technical demands of modern AI-ready facilities. The process necessitates a shift in focus from traditional data center models toward specialized architectures capable of supporting the high density and cooling needs characteristic of contemporary HPC environments.

    While securing energy access serves as the starting point for campus development, long-term success depends on aligning infrastructure design with the evolving technical specifications of AI hardware deployments.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/opinions/from-power-to-ai-readiness-the-architecture-decisions-behind-terawulfs-ai-and-high-performance-computing-campus/

  • Vultr plans 20MW AI infrastructure cluster in Chennai

    Vultr plans 20MW AI infrastructure cluster in Chennai

    Vultr has announced a significant expansion of its digital infrastructure in India with plans to deploy a 20MW cluster utilizing AMD MI355X accelerators in Chennai. According to the announcement, this project will represent the largest deployment of AMD Instinct technology within the country.

    The initiative highlights the growing demand for specialized high-performance computing resources capable of supporting large-scale artificial intelligence workloads. By integrating advanced AMD hardware, Vultr aims to provide increased compute capacity to support the evolving requirements of the regional digital economy.

    As this project proceeds, it will serve as a notable addition to the growing data center landscape in Chennai, which has become an increasingly strategic hub for digital infrastructure investment in South Asia.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/vultr-to-deploy-20mw-amd-mi355x-cluster-in-chennai-india/

  • Tata Power targets 2.8GW of infrastructure for Indian data center market

    Tata Power targets 2.8GW of infrastructure for Indian data center market

    Tata Power is reportedly aiming to develop 2.8GW of electrical generation, transmission, and distribution capacity specifically tailored to support the expanding Indian data center sector.

    This initiative aligns with broader market projections indicating that India’s total data center capacity is expected to reach 26.3GW by the 2031-32 fiscal year. As the digital economy grows, the demand for reliable power infrastructure has become a critical bottleneck and focal point for utility providers looking to support the rapid development of large-scale digital facilities.

    No further technical specifications or timelines for the rollout of this 2.8GW capacity were disclosed in the current reports. DEROBS will continue to monitor official company announcements regarding the implementation of these energy projects.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/tata-power-eyes-28gw-of-generation-transmission-and-distribution-for-indian-data-center-sector/

  • SC Capital Partners initiates 40MW data center project in Pohang

    SC Capital Partners initiates 40MW data center project in Pohang

    SC Capital Partners has confirmed an investment in a new data center project located in Pohang, South Korea. The facility is designed to provide 40MW of capacity.

    The development is being undertaken in partnership with NeoAI Cloud. Further details regarding the construction timeline, technical specifications, or investment valuation were not provided in the initial announcement.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/sc-capital-partners-invests-in-40mw-data-center-in-pohang-south-korea/

  • Vantage enters 1GW supply agreement for solid-state transformers with Heron Power

    Vantage enters 1GW supply agreement for solid-state transformers with Heron Power

    Vantage has entered into a supply agreement with Heron Power to provide 1GW of capacity using the company’s Heron Link solid-state transformer (SST) technology. The deal marks a significant step in the procurement of advanced power management hardware for Vantage’s data center portfolio.

    Solid-state transformers serve as a critical component in managing electrical distribution within energy-intensive environments, such as large-scale data centers. By utilizing advanced power electronics, SSTs are designed to offer enhanced control and efficiency over traditional electromagnetic transformer designs, which is increasingly relevant as data centers face growing power density requirements.

    The agreement focuses on the integration of Heron Power’s specific hardware solution, the Heron Link, into Vantage’s infrastructure deployments. As the demand for robust and efficient digital infrastructure grows, the adoption of solid-state power technologies represents an evolving effort to optimize grid connectivity and electrical delivery for hyperscale and enterprise facilities.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/vantage-signs-1gw-solid-state-transformer-supply-deal-with-heron-power/

  • GigaCenter data center facility in Kyiv destroyed

    GigaCenter data center facility in Kyiv destroyed

    The GigaCenter data center in Kyiv, Ukraine, has been destroyed by Russian forces, according to reports from Data Center Dynamics. The facility, which served as a piece of critical digital infrastructure, was impacted during ongoing military conflicts in the region.

    Reports indicate that the destruction of this site coincides with broader military engagement targeting telecommunications infrastructure within Russian-occupied territories, including Donetsk and Luhansk. The loss of the GigaCenter facility marks a significant development in the impact of the conflict on regional digital connectivity and data storage capabilities.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/russian-forces-destroy-gigacenter-data-center-in-kyiv-ukraine/

  • BT expands 5G standalone network and initiates AI-RAN trials

    BT expands 5G standalone network and initiates AI-RAN trials

    BT has announced plans to extend its 5G standalone (5G SA) network coverage. Alongside this infrastructure expansion, the company confirmed it will initiate trials for AI-Radio Access Network (AI-RAN) technology.

    These upcoming trials, scheduled to take place next year, involve collaborations with technology partners Nokia and Nvidia. The integration of artificial intelligence into the Radio Access Network is intended to explore new operational efficiencies for mobile infrastructure.

    While further technical specifications regarding the extent of the 5G rollout and the specific parameters of the AI-RAN trials remain limited, these developments represent BT’s ongoing effort to modernize its network capabilities through both standalone 5G architecture and AI-driven optimizations.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/bt-bolsters-5g-standalone-footprint-confirms-ai-ran-trials-with-nokia-nvidia/

  • Neocloud Aolani secures letter of intent for 500MW of data center capacity in Malaysia

    Neocloud Aolani secures letter of intent for 500MW of data center capacity in Malaysia

    Startup company Neocloud Aolani has entered into a letter of intent (LOI) to secure 500MW of data center capacity in Malaysia. This development significantly scales the company’s regional footprint, bringing its total committed capacity to 580MW.

    As the digital economy continues to drive demand for large-scale compute infrastructure, such commitments underscore the ongoing expansion of data center projects within the Malaysian market. The agreement marks a substantial increase in Neocloud Aolani’s planned infrastructure pipeline.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/startup-neocloud-aolani-signs-loi-for-500mw-of-capacity-in-malaysia/

  • Memphis council rejects 18-month data center moratorium, opts for 135-day ban

    Memphis council rejects 18-month data center moratorium, opts for 135-day ban

    The Memphis city council has officially rejected a proposal that would have imposed an 18-month moratorium on the development of new data centers. In a move to address concerns regarding the expansion of such facilities, the council opted to implement a shorter, 135-day ban on new projects instead.

    This decision marks a shift in the regulatory approach toward data center infrastructure within the region. The shorter timeframe allows for a temporary pause on new construction while presumably providing the city additional time to evaluate the impact and requirements of these projects.

    Source: Data Center Dynamics
    Original article: https://www.datacenterdynamics.com/en/news/memphis-data-center-moratorium-xai-elon-musk/